wire on tube evaporator, capacity: 12000 pcs per day
Raw material | (1) Rolling welded steel pipe: O.D8, with wall thickness 0.7 (2) Low carbon steel wire φ1.4 -- φ1.5 (3) Bracket: Steel plate (SPCC) with thickness: 0.6 -- 0.8 | Structure | Structure 1: Evaporator for single temperature control system (single capillary evaporator) Structure 2: Evaporator for double temperature control system (double capillary evaporator) Structure 3: Evaporator for three way temperature control system (three capillary evaporator) | Key process | Tube bending, Welding, Mono shelf assemble, Assembly welding, Leakage test, Coating, Inspection, Package | Technical Ability | The distance of wire steel: ≥6 mm, can produce according to the drawing or samples supplied by clients, also can help the clients design and produce different evaporators. | Performance | 1) Surface treated with powder painting or dip coating to prevent the corrosion 2) Inner cleanness can meet the requirement of R134a & CFC cooling system.3) Can satisfy the cooling capability requirements. | Performance | 6 million sets per year (20000 sets per day) |
|
R134a Cooling System Tube Inside standards |
Residual moisture | ≤20mg/m2 | Residual impurity | ≤30mg/m2 | Residual mineral oil | ≤7mg/m2 | Residual chlorine | ≤0.3 mg/m2 | Residual paraffin | ≤0.2 mg/m2 |
|
Specification of coating |
Coating thickness | thickness of coating 30 100 μ m | Hardness of coating | ≥2H | Impact of coating | 50cmkg/cm impact, no crack | Adhesion of coating | ≥two grade | Flexibility of coating | Around R=3D bend 180°, no crack or no fall off | Color tolerance of powderpainting | E≤1.5 |
|
Wire on tube Evaporator